4.14.2010

Planning is Stewpid

Last week and the two final days of the week before were spring break in my school district where I work. The district offices were blissfully quiet and empty and I was able to get a bunch of work done which was nice.

Fast forward to today and there is construction or something going on in the building which requires them to cut into the walls every couple of minutes. The noise and vibration are echoing through the offices and are incredibly loud, distracting and annoying.

This work could have and should have been done last week when it would have been least disruptive. But no, they are doing it now and driving me and everyone else in a hundred foot radius up a tree with the non-stop noise.

Sometimes I do wish I was working for a company that needed to do things efficiently and smartly. This bureaucratic education stuff can get old because of the built-in dumbassery.
blog comments powered by Disqus